Simberi Gold Project
Allied Gold
BatteryLimits has commenced work on the Simberi Gold Bankable Feasibility Study for a 2.5 Mt/a refractory gold flotation and roasting project and expansion of the oxide plant from 2 to 5 Mt/a. BatteryLimits is managing the study, managing the metallurgical testwork and undertaking the process design.
BatteryLimits prepared a Prefeasibility Study on the project during 2010.